← All tools
Carpenter
Asphalt
Tonnes of asphalt for an area and depth.
Asphalt required
6 t
Volume2.5 m3
Formula
tonnes = area x (depth / 1000) x density
50 x (50 / 1000) x 2.4 = 6 t
Carpenter
Tonnes of asphalt for an area and depth.
Asphalt required
6 t
Formula
tonnes = area x (depth / 1000) x density
50 x (50 / 1000) x 2.4 = 6 t